Click Here

0800 779 7778

Call us Free

Horizontal to Vertical Flue

Boiler Bolt-On · Flue route

Horizontal to vertical flue

A boiler flue takes combustion products safely outdoors. If a suitable wall exit is unavailable for the chosen boiler position, a vertical route through the roof may be considered. We plan the route and terminal before quoting.

Two possible routes

Wall exit or roof exit?

Both diagrams show an illustrative route from the same boiler position. They are alternatives, not two flues installed together. The exact terminal position, components and permissible length are set by the chosen appliance and survey.

OPTION A · WALL EXITOPTION B · ROOF EXIT BOILERBOILER Horizontal flueWall terminalVertical flueRoof exitRoof flashingCheck outside terminal clearancesCheck roof penetration and terminal position OPTION A · WALL EXITOPTION B · ROOF EXIT BOILERBOILER Horizontal flueWall terminalVertical flueRoof exitRoof flashingCheck outside terminal clearancesCheck roof penetration and terminal position
The red vertical route visibly passes through the roof and finishes at an outdoor terminal. Roof type, terminal clearances and access are checked before the route is agreed.

How we choose the right route

Check the boiler position

We look at external walls, neighbouring structures, openings and where combustion products can discharge safely.

Plan the roof route

If a vertical route is needed, we assess the roof, internal path, clearances and access for installation and future servicing.

Confirm components

We select the approved flue kit, extensions and bends for the specific boiler, then list the roof work and making good in the quote.

What is involved

  • Planning a flue path from the chosen boiler to a suitable roof terminal.
  • Installing manufacturer-approved vertical flue components, supports and terminal.
  • Making and weatherproofing the roof penetration with the specified flashing.
  • Testing the completed installation and recording commissioning checks.

What we check at survey

  • Whether a compliant horizontal wall terminal remains possible.
  • Roof type, structure, loft access and a feasible internal route.
  • Terminal positions relative to openings, adjoining structures and boundaries.
  • Manufacturer limits for total length and bends, plus condensate drainage and service access.

What affects the quote

  • Roof height, pitch, covering and safe access arrangements.
  • Flue length, number of bends and required approved components.
  • Openings through ceilings or roof, flashing and weatherproofing.
  • Any boxing, specialist roof work or making good specified after survey.

What your written quote includes

  • The agreed flue route and named components for the selected boiler.
  • Roof penetration, flashing, access provision and weathering included.
  • The extent of any internal boxing and making good.
  • Testing, commissioning and clear exclusions or separately quoted work.
Standard installation versus optional work: every boiler installation needs a suitable flue. A roof route and its additional components or building work are optional scope only where the written quote includes them. We do not assume a fixed standard flue allowance or a fixed price here. Final design follows the property survey and the chosen manufacturer’s instructions.

Vertical flue questions

Why not simply use a longer horizontal flue?

The terminal still needs a suitable position, and the chosen boiler has limits on flue length and bends. We assess both routes rather than assume a longer wall route will work.

Can the flue go through any roof?

No. Roof covering, structure, access, terminal position and compatible flashing all matter. The site survey determines whether a roof route is practical.

Will the roof be watertight afterwards?

The specified roof penetration and weathering are part of the planned installation. The written quote should identify the roofing work and who carries it out.

Can my old flue be reused?

That depends on the selected boiler and the manufacturer’s approved flue system. We specify compatible components after survey rather than promise reuse.

Are extra bends included?

Only the bends and extensions shown in your written quote are included. We list any additional route work separately when the survey reveals it.

Ask us about a roof flue route

Tell us your postcode, boiler location and roof type if you know it. We will check feasible routes before putting the scope in writing.

Prefer the website form? Contact MPH Boilers and mention “Horizontal to vertical flue”.